OOKSAN IMT Co., Ltd., your partner providing
the total solution of production equipment

System Solution Division runs the engineering to mass-production Full Turn-key business of automobile parts
assembly line equipment for internal combustion engine, eco-friendly automobile HEV assembly equipment as new business, and EV motor assembly line.
We are your partner of providing the total solution of production equipment in such processes as manufacturing,
installation and maintenance by using our customer-optimized technology and service in terms of proposal and engineering that
meet users’ diverse needs in line with the changing smart equipment establishment in manufacturing settings.

Internal Combustion Engine

내연기관

Our company has shown a lot of performance in auto/manual transmission & engine assembly line, giving the best customized responses to customers through its accumulated know-how.

Engine Assembly Line

Transmission Assembly Line

Main Business Achievements

Date Achievements
2024. GM DK68 Engine Assembly Line
2023. HD Hyundai Infracore Large Engine Assembly Line
2021. North America 8SP Full Body A/T
2020. Hyundai Transys, Mexico Monterey Economic SC PE Model Addition
2019. Hyundai Transys, Mexico Monterey IVT Pulley Suction Process Addition
2019. Hyundai Transys, Mexico Monterey ISG & SC PE Model Addition
2019. Hyundai, Ulsan Factory GammaⅡ Engine Assembly Line
2018. GM, Bupyeong Factory CSS Engine & C/Head Sub Line
2018. Hirata, Japan Jatco FR9 Speed Transmission Assembly Line
2016. China, Xi'an Train R103 Axle Ass’y Line
2016. Hirata, US FORD 10R Engine Auto Assembly Line
2016. Hyundai Dymos, M5EF2 Manual Assembly Line
2016. Hyundai, Ulsan Factory 7-Speed DCT Assembly Line
2016. Hirata, US GM Transmission Auto Assembly Line
2015. Hirata, US Honda Transmission Auto Assembly Line
2015. Hyundai Powertech, Mexico PTM 6-Speed Assembly Line
2014. Hyundai Dymos, Seosan Factory X100 Manual Transmission Assembly Line
2011. GM, China LZ PT2 Cylinder Head Assembly Line
2011. Hyundai, Beijing Mobis 3-Factory 6-Speed Manual Transmission Assembly Line
2010. GM, Gunsan Factory FAM-Z Engine Assembly Line
2010. GRE PJT MAIN & TEST LINE
2010. GM, Thailand VMM Engine Assembly Line
2010. Hyundai, PUMP Assembly M/C
2009. GM, US Toledo GF-6 LINE
2009. Hyundai, Ulsan Factory Lamda 6-Speed Auto Transmission Assembly Line
2008. GM, US Toledo GF-6 PJT Assembly & Test Line

Main Customers

Process

01Consulting

  • Find/analyze the current issues
  • Suggest a reasonable improvement plan
  • Draw an optimal system

02Design

  • Analyze process/ analyze the quantity of goods
  • Develop the system for a special purpose
  • Simulate and analyze properties
  • Make lightweight/standardization design
  • Reflect the drawn issues
  • Review drawings(D.R)

03Manufacturing/Installation

  • Shop-test before shipping
    (User Layout/ Shop Test))
  • Manufacture/Standard JIG for inspection
    Quality standardization
  • Install by experts with a lot of experience

04Test-operation / After-sales service

  • Establish the test-operation solution for each equipment
  • Secure the test-operation profile for customer verification
  • Conduct preventive inspection and provide maintenance education